Capacity Increase of Kumköy Wastewater Treatment Plant (WWTP)

The scope of the project is increasing the treatment capacity of Kumköy Wastewater Treatment Plant (WWTP).
The existing WWTP has treatment capacity of 50 000 m3/day and because of increasing population in the catchment area of the WWTP especially in summer time, the existing capacity started to be insufficient Hence, the detailed design is conducted by Rast in order to increase the treatment capacity of WWTP from 50 000 m3/day to 75 000 m3/day.

The detailed design consists of soil improvement, architectural, civil, electrical and mechanical designs, bill of quantities and detailed technical specification of intake pumping station, screening, grit removal, aeration tank, final sedimentations tank, return sludge pumping station, blower building and sludge dewatering units.

Client

Antalya Water and Wastewater Admin. (ASAT)

Scope

Engineering Services

Location

Antalya/Turkey

Year

2012

Environment

Capacity Building Support to Turkey on Groundwater Management
Türkiye'nin Yeraltı Suyu Yönetimi Kapasitesinin Geliştirilmesi

Environment

Tavşanlı Hazardous Waste Incineration Plant
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Istanbul Thermal Treatment Plant
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Kömürcüoda Hazardous Waste Interim Storage and Landfill
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Environmental Management System – 2
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Hakan Coal-Fired Power Plant
Hakan Madencilik ve Elektrik Üretim San. Tic. A.Ş.

Environment

Tavşanlı Hazardous Waste Landfill
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Environmental Management System – 1
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Tekkale Regulator and Hydroelectric Power Plant
Haldız İnşaat Oto ve Tic. Ltd. Şti.