Istanbul & Thrace Region Integrated Hazardous Waste Treatment Plant

Preparation of feasibility study with cost-benefit analysis. Determination of hazardous waste quantity and composition, demarcation of catchment areas and site selection on basis of a survey of current hazardous waste disposal facilities in Thrace Region.Evaluation of different technologies and cost estimations for treatment plant.
Preparation of EIA Report. Coordination of all necessary sub-studies including air quality modeling, noise assessment and socio-economic studies.

Client

Kandur Energy Ltd.

Scope

Feasiblity Study, EIA Study

Location

Tekirdağ/Turkey

Year

2007-2008

Environment

Asya Port Liman
Asyaport Liman A.Ş.

Environment

Tavşanlı Hazardous Waste Incineration Plant
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Istanbul Thermal Treatment Plant
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Kömürcüoda Hazardous Waste Interim Storage and Landfill
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Environmental Management System – 2
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Hakan Coal-Fired Power Plant
Hakan Madencilik ve Elektrik Üretim San. Tic. A.Ş.

Environment

Tavşanlı Hazardous Waste Landfill
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Environmental Management System – 1
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Tekkale Regulator and Hydroelectric Power Plant
Haldız İinşaat Oto ve Tic. Ltd. Şti.

Infrastructure

Melen (Düzce) Area Wastewater Treatment Plants
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Infrastructure

Manavgat Sewage Sludge Management Feasibility Study
Antalya Su ve Atıksu İdaresi Genel Müd. (ASAT)

Featured Projects

Danamandıra Drinking Water Treatment Plant
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)