Manisa-Alaşehir-Kavaklıdere Geothermal Energy Plant

Within the scope of EIA (PIF) study, the positive and negative environmental impacts of the Maspo Geothermal Energy Plant IV with 10 MWe (10 MWm) installed capacity were determined.
In the context of current situation determination study, literature review was conducted. In order to determine the flora and fauna of the project area and impact area, sampling studies were carried out by expert biologists on land, and the outcomes supported with literature review were reported.
Potential noise emissions from the plant were evaluated and impact modelling studies were conducted.
The measures to be taken in accordance with the Turkish Environmental Legislation for mitigation of the potential negative effects were explained in the PIF Report.

Client

Maspo Energy Inc.

Scope

EIA Study

Location

Manisa

Year

2012-2015

Environment

Capacity Building Support to Turkey on Groundwater Management
Türkiye'nin Yeraltı Suyu Yönetimi Kapasitesinin Geliştirilmesi

Environment

Tavşanlı Hazardous Waste Incineration Plant
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Istanbul Thermal Treatment Plant
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Kömürcüoda Hazardous Waste Interim Storage and Landfill
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Environmental Management System – 2
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Hakan Coal-Fired Power Plant
Hakan Madencilik ve Elektrik Üretim San. Tic. A.Ş.

Environment

Tavşanlı Hazardous Waste Landfill
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Environmental Management System – 1
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Tekkale Regulator and Hydroelectric Power Plant
Haldız İnşaat Oto ve Tic. Ltd. Şti.