East Mediterranean Integrated Hazardous Waste Treatment Plant

Preparation of EIA Report. Coordination of all necessary sub-studies including air quality modeling, noise assessment and socio-economic studies.
Research on the inventory of the current hazardous waste treatment plants. Basic analysis on the current standards of Turkey, Germany and EU concerning hazardous waste treatment. Evaluation of different technologies. Demarcation of catchment areas and determination of the hazardous waste (quantity, type, composition). Planning of an integrated hazardous waste treatment plant consisting of Landfill (15.000 ton/year), Incineration plant (7.500 ton/year) and Chemical / Physical treatment plant (1.500 ton/year).

Client

Sismik Constructrion Inc.

Scope

EIA Study, Engineering Services

Location

Mersin/Turkey

Year

2006-2007

Environment

Capacity Building Support to Turkey on Groundwater Management
Türkiye'nin Yeraltı Suyu Yönetimi Kapasitesinin Geliştirilmesi

Environment

Tavşanlı Hazardous Waste Incineration Plant
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Istanbul Thermal Treatment Plant
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Kömürcüoda Hazardous Waste Interim Storage and Landfill
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Environmental Management System – 2
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Hakan Coal-Fired Power Plant
Hakan Madencilik ve Elektrik Üretim San. Tic. A.Ş.

Environment

Tavşanlı Hazardous Waste Landfill
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Environmental Management System – 1
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Tekkale Regulator and Hydroelectric Power Plant
Haldız İnşaat Oto ve Tic. Ltd. Şti.