Preparation of EIA Report. Coordination of all necessary sub-studies including air quality modeling, noise assessment and socio-economic studies.
Research on the inventory of the current hazardous waste treatment plants. Basic analysis on the current standards of Turkey, Germany and EU concerning hazardous waste treatment. Evaluation of different technologies. Demarcation of catchment areas and determination of the hazardous waste (quantity, type, composition). Planning of an integrated hazardous waste treatment plant consisting of Landfill (15.000 ton/year), Incineration plant (7.500 ton/year) and Chemical / Physical treatment plant (1.500 ton/year).