Manavgat Sewage Sludge Management Feasibility Study

A feasibility study for different sewage sludge management scenarios is prepared. In the feasibilty report, different types of treatment methods and their cost-benefit analysis are studied.
Client

Antalya Water and Wastewater Admin. (ASAT)

Scope

Feasibility Study

Location

Antalya/Turkey

Year

2012

Environment

Asya Port Liman
Asyaport Liman A.Ş.

Environment

Tavşanlı Hazardous Waste Incineration Plant
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Istanbul Thermal Treatment Plant
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Kömürcüoda Hazardous Waste Interim Storage and Landfill
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Environmental Management System – 2
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Hakan Coal-Fired Power Plant
Hakan Madencilik ve Elektrik Üretim San. Tic. A.Ş.

Environment

Tavşanlı Hazardous Waste Landfill
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Environmental Management System – 1
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Tekkale Regulator and Hydroelectric Power Plant
Haldız İinşaat Oto ve Tic. Ltd. Şti.

Infrastructure

Melen (Düzce) Area Wastewater Treatment Plants
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Infrastructure

Manavgat Sewage Sludge Management Feasibility Study
Antalya Su ve Atıksu İdaresi Genel Müd. (ASAT)

Featured Projects

Danamandıra Drinking Water Treatment Plant
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)