Inside the boundary of Istanbul Metropolitan Municipality (5200 km2), necessary surveys and feasibility studies were carried out to assess waste quantity, waste streams, global costs of facilities and evaluation of alternative sites; which are necessary to establish landfill, incineration plant and chemical-physical treatment plant for disposal of domestic and industrial wastes.