Asyaport Liman A.Ş. – Ecosystem Assessment Report with Project Impacts

The subject of the project is the “Asyaport Port Capacity Increase Project” to be carried out by Asyaport Liman A.Ş. in the Barbaros Mahallesi area of Süleymanpaşa District, Tekirdağ Province. The project area has been determined to be located within the Marmara Sea and Islands Special Environmental Protection Area by Presidential Decree No. 4758 dated November 4, 2021, published in the Official Gazette No. 31650 dated November 5, 2021.

Therefore, the Project Impacts and Ecosystem Assessment Report (EDR) required for activities to be carried out in the Marmara Sea and Islands Special Environmental Protection Area has been prepared in accordance with the format published by the General Directorate of Nature Conservation of the Ministry of Environment, Urbanization, and Climate Change of the Republic of Turkey.

Within the scope of the EDR studies, marine biological surveys of the activity area and its surroundings were conducted on December 24, 2021, through coastal observations and diving. These studies were supported by a literature review.

The purpose of the EDR study is to reveal the biodiversity characteristics of the marine environment in terms of the ecological structure and marine species under protection in the activity area and its immediate surroundings, to determine the possible effects of the activity on the existing marine ecosystem during both the construction and operation phases, and to identify the necessary measures to minimize these effects.

Client

Asyaport Liman A.Ş.

Scope

Ecosystem Assessment Report (EDR) with Project Impacts

Location

Tekirdağ

Year

12/2021 - 01/2022

Environment

Capacity Building Support to Turkey on Groundwater Management
Türkiye'nin Yeraltı Suyu Yönetimi Kapasitesinin Geliştirilmesi

Environment

Tavşanlı Hazardous Waste Incineration Plant
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Istanbul Thermal Treatment Plant
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Kömürcüoda Hazardous Waste Interim Storage and Landfill
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Environmental Management System – 2
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Hakan Coal-Fired Power Plant
Hakan Madencilik ve Elektrik Üretim San. Tic. A.Ş.

Environment

Tavşanlı Hazardous Waste Landfill
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Environmental Management System – 1
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Tekkale Regulator and Hydroelectric Power Plant
Haldız İnşaat Oto ve Tic. Ltd. Şti.