Tekkale Regulator and Hydroelectric Power Plant

Preparation of EIA Report. Coordination of all necessary sub-studies including air quality modeling, noise assessment, ecosystem assessment report and socio-economic studies.
Client

Haldız Construction Ltd.

Scope

EIA Study

Location

Artvin

Year

2012-2016

Environment

Capacity Building Support to Turkey on Groundwater Management
Türkiye'nin Yeraltı Suyu Yönetimi Kapasitesinin Geliştirilmesi

Environment

Tavşanlı Hazardous Waste Incineration Plant
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Istanbul Thermal Treatment Plant
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Kömürcüoda Hazardous Waste Interim Storage and Landfill
İstanbul Çevre Yönetimi San. ve Tic. A.Ş. (İSTAÇ)

Environment

Environmental Management System – 2
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Hakan Coal-Fired Power Plant
Hakan Madencilik ve Elektrik Üretim San. Tic. A.Ş.

Environment

Tavşanlı Hazardous Waste Landfill
MSG Entegre Geri Kazanım ve Enerji A.Ş.

Environment

Environmental Management System – 1
İstanbul Su ve Kanalizasyon İdaresi (İSKİ)

Environment

Tekkale Regulator and Hydroelectric Power Plant
Haldız İnşaat Oto ve Tic. Ltd. Şti.