As part of the GOSB AAT Project, it is planned to establish an AAT for the recovery of wastewater treated with advanced technologies (Ultrafiltration, Reverse Osmosis) from GOSB AAT and to construct a new 10,936-meter pipeline in addition to the existing water distribution lines to deliver the recovered wastewater to industrialists.
Environmental and Social Impact Assessment (ESIA) studies have been conducted in accordance with IFC Performance Standards. The Environmental and Social Management Plan (ESMP) and Project Implementation Plan (PIP) have been prepared in accordance with IFC/WB Standards.