Planning of thermal treatment plant with 2 lines of gasification furnace for municipal waste (165.000 ton/year) and 1 line of rotary kiln for industrial waste (33.000 ton/year). Preparation of pre-feasibility study (approved by Ministry of Environment and Urbanization) and feasibility study (approved by Ministry of Development).
Preparation of EIA Report. Coordination of all necessary sub-studies including air quality modeling, noise assessment and socio-economic studies.